-
Question/Guidance
-
Resolution: Resolved
-
Moderate
-
None
-
None
If the measure logic calls for only a Relevant.datetime, and is not using the (Normalize Interval) concept:
The file contains only and Effective time <Low> but not an Effective Time <High>
- Should the measure logic fail use/process this as Relevant DateTime?