-
Bug/Issue
-
Resolution: Resolved
-
Moderate
-
CMS0069v10
-
v6.2.2.1
-
Bug/Issue EC eCQMs Question
We have a patient that was conditioned with intervention, order on 01/01/2023 (Authordatetime) to not meet the numerator for CMS69v10 based on the guidance from CMS. https://ecqi.healthit.gov/sites/default/files/CMS69v10_BMI_Measure_Guidance.pdf This patient is meeting the numerator when the QRDA I file validated in our Cypress testing for CMS69.
- Should the QRDA I include the intervention, order outside the measurement period?
- Is this a possible issue with Cypress v6.2.2.1?