Uploaded image for project: 'eCQM Issue Tracker'
  1. eCQM Issue Tracker
  2. CQM-239

Timing of anesthesia and surgical start

XMLWordPrintable

    • Icon: EH/CAH eCQMs EH/CAH eCQMs
    • Resolution: Reopen
    • Icon: Major Major
    • Inbox
    • None
    • Maggie Lohnes
    • Vendor/McKesson
    • Maybe
    • Hide
      Has been clarified in Implementation Guide. A =0 days Ends after End B means: A ends after the end of B, but on the same day. See time duration calculation in current implementation guide for more explanation.
      http://www.cms.gov/Regulations-and-Guidance/Legislation/EHRIncentivePrograms/Downloads/2014_eCQM_Measure_Logic_Guidance.pdf
      Show
      Has been clarified in Implementation Guide. A =0 days Ends after End B means: A ends after the end of B, but on the same day. See time duration calculation in current implementation guide for more explanation. http://www.cms.gov/Regulations-and-Guidance/Legislation/EHRIncentivePrograms/Downloads/2014_eCQM_Measure_Logic_Guidance.pdf
    • CMS113v1/NQF0469, CMS178v1/NQF0453

      "Occurrence A of Procedure, Performed: SCIP Major Surgical Procedure (ordinality: 'Hospital Measures - Principal')" = 0 day(s) ends after end of "Occurrence A of Procedure, Performed: Hospital Measures-Joint Commission Evidence of a surgical procedure requiring general or neuraxial anesthesia"

      Please clarify the date logic to accomplish measure intent. In practice it is unlikely to have two date/time stamps to be exactly equal; more often, anesthestia procedure would precede the surgical procedure and extend beyond the end of the surgical window.

            julia.skapik Julia Skapik (Inactive)
            maggielohnes Maggie Lohnes (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

              Created:
              Updated:
              Resolved: