-
Type:
Question/Guidance
-
Resolution: Resolved
-
Priority:
Moderate
-
Component/s: None
-
None
-
CMS0108v12
-
Correct mapping of elements
-
Banner Health
-
Cari Jones
-
4054738842
-
I am hoping you can help with some clarification of the timing surround the element for General or Neuraxial Anesthesia for both VTE1 & 2.
Ex:
for VTE 1 I have the following incident-
IP start date/time: 08.13.24 at 1313
Anesthesia stop date/time: 08.13.24 at 1802
Is the window of time for VTE 1 General or Neuraxial Anesthesia to start from the day of the IP encounter and end the following day
Since the Anesthesia stopped after the IP encounter start time, would I expect to see the General of Neuraxial Anesthesia date/time pulled into the QRDA file? In other words, because of the timing of the end of the anesthesia (ends after IP encounter starts) the element counts towards the measure for this particular encounter?
for VTE 2 I have the following incident-
ICU start date/time-12.21.23 at 0416
Anesthesia stop date/time- 12.21.23 at 0406
Is the window of time for VTE 2 General or Neuraxial Anesthesia to start the day of or the day after ICU admission or transfer?
Since the Anesthesia stopped the day of the ICU start date, should I expect to see the General or Neuraxial Anesthesia date/time pulled into the QRDA file? In other words, because of the timing (anesthesia ends the day of the ICU admit), the element counts toward the measure for this particular encounter?