Author Date Time Not Available in Bonnie for Procedure Performed Datatype

XMLWordPrintable

    • Type: Bug/Issue
    • Resolution: Deferred
    • Priority: Moderate
    • Component/s: Measure View
    • POSTOPERATIVE AMBULATION DAY OF SURGERY
    • CMS782v0
    • NumerPass AmbStarts1MinPriorToPACUdc

      The Procedure Performed datatype has both the relevant period attribute  as well as the author date/time attribute.  Acknowledging that it is preferable to use relevant period, we have a use case where we are wanting to use author date/time.  We cannot see where we can qualify on author date/time in Bonnie.  See attached screenshot.

            Assignee:
            Unassigned
            Reporter:
            Marilyn Parenzan (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Created:
              Updated:
              Resolved: